人人草人人做人人爱,我故意没有穿内裤坐公车让视频,永久免费看啪啪的网站,岛国av动作片在线观看

濟(jì)南誠耐金屬制品有限公司

濟(jì)南誠耐金屬制品有限公司

不斷發(fā)展技術(shù)力量、完善的設(shè)計(jì)服務(wù)團(tuán)隊(duì),真誠為您提供的服務(wù)

咨詢熱線
于經(jīng)理15194166167
15990909037

聯(lián)系我們

企業(yè)名稱:濟(jì)南誠耐金屬制品有限公司

聯(lián)系人:于經(jīng)理

電話: 15990909037

電話: 15194166167

地址:山東省濟(jì)南市歷城區(qū)小清河南路8288號

當(dāng)前位置:首頁 »資訊中心 » 新聞資訊淄博電梯門套廠家:收口怎么做?

淄博電梯門套廠家:收口怎么做?

來源:http://www.shsb373.cn/ 瀏覽:0發(fā)表時(shí)間:2024-11-20

  電梯門套收口做法通常包括以下幾個(gè)步驟:

  The method of closing elevator door frames usually includes the following steps:

  處理墻面不平處 :確保墻面平整,并清理灰塵。

  Handle uneven areas on the wall: Ensure that the wall is flat and clean up dust.

  中心定位 :根據(jù)電梯安裝要求,進(jìn)行中心定位,并彈線以確定門套位置。

  Central positioning: According to the installation requirements of the elevator, perform central positioning and mark the line to determine the position of the door frame.

  安裝門套基層 :使用大芯板作為基層,用木條和木楔子固定,豎向間距控制在100mm—200mm之間,邊口用細(xì)木條塞縫。

  Installation of door frame base: Use a large core board as the base, fix it with wooden strips and wedges, and control the vertical spacing between 100mm and 200mm. Use thin wooden strips to fill the gaps at the edges.

O1CN01GGLqXX1KU4Ywv34va_!!2209449911166-0-cib

  剪裁和包邊 :根據(jù)門套尺寸剪裁線條,并進(jìn)行45度斜切處理,使其圓潤美觀。使用專用包邊條將多余部分包裹,留出伸縮縫。

  Cutting and edging: Cut the lines according to the size of the door frame and perform a 45 degree oblique cut to make it rounded and beautiful. Wrap the excess part with a dedicated edging strip, leaving expansion joints.

  固定骨架 :在墻體上打孔,預(yù)埋膨脹螺栓,將不銹鋼電梯門套線條的骨架安裝在墻體上。

  Fixed skeleton: Drill holes on the wall, embed expansion bolts, and install the skeleton of stainless steel elevator door frame lines on the wall.

  安裝門套 :將制作好的門套線條安裝在墻體上,并確保線條完全覆蓋門洞上方部位,預(yù)留伸縮量。

  Install door frame: Install the pre made door frame lines on the wall and ensure that the lines completely cover the area above the door opening, leaving room for expansion and contraction.

  填充縫隙 :使用發(fā)泡劑填充門套與墻體之間的縫隙,確保密封。

  Fill the gap: Use foaming agent to fill the gap between the door frame and the wall to ensure sealing.

  安裝門扇 :將電梯門安裝到門套上,確保合頁位置準(zhǔn)確,門與門套的間隙控制在1.5mm以內(nèi),以保證順暢開關(guān)門。

  Install door leaf: Install the elevator door onto the door frame, ensuring accurate hinge position and controlling the gap between the door and the frame within 1.5mm to ensure smooth opening and closing of the door.

  質(zhì)量檢查 :檢查安裝后的門套是否牢固、準(zhǔn)確、穩(wěn)定,并進(jìn)行必要的修整。

  Quality inspection: Check whether the installed door frame is firm, accurate, and stable, and make necessary adjustments.

  以上步驟完成后,電梯門套收口工作基本完成。請根據(jù)具體情況調(diào)整施工細(xì)節(jié),并遵循相關(guān)施工規(guī)范和標(biāo)準(zhǔn)

  After completing the above steps, the elevator door frame closing work is basically completed. Please adjust the construction details according to the specific situation and follow relevant construction specifications and safety standards

  本文來自:淄博電梯門套廠家更多的內(nèi)容請點(diǎn)擊:http://www.shsb373.cn我們將會(huì)為您提問的問題提供一個(gè)滿意的服務(wù),歡迎您的來電!

  This article is from Zibo Elevator Door Frame Manufacturer. For more content, please click: http://www.shsb373.cn We will provide satisfactory service for the questions you ask. Welcome to call us!